"Crystal Fish 2025" civil protection drill – provisional anti-flood measures are introduced at the construction site of Linking Bridge A3 at New Area Zone A.
“Crystal Fish 2025” civil protection drill – provisional anti-flood measures at the construction site of Linking Bridge A3 at New Area Zone A.
"Crystal Fish 2025" civil protection drill – provisional anti-flood measures are introduced at the construction site of Linking Bridge A3 at New Area Zone A.

