"Crystal Fish 2025" civil protection drill – a pre-fabricated housing unit is overturned by strong winds. The Public Security Forces collaborates with the construction firm to send a crane truck and arrange for personnel to demolish the unit and remove it from the scene.
“Crystal Fish 2025” civil protection drill – removal of a pre-fabricated housing unit which is overturned by strong winds.
"Crystal Fish 2025" civil protection drill – a pre-fabricated housing unit is overturned by strong winds. The Public Security Forces collaborates with the construction firm to send a crane truck and arrange for personnel to demolish the unit and remove it from the scene.

