According to the information of the Meteorological and Geophysical Bureau, Typhoon Signal No. 8 will be issued at 5 p.m. Motorists should take note that the lower deck of the Sai Van Bridge will resume access by light vehicles and authorized vehicles at 5 p.m., but its bridge floor deck will remain closed.