Inspection of Water Supply System of Building

First-time Application


How to process

Required Document:

1.Appllication form 006/DEM(Available at all public services centres of the Municipal Affairs Bureau (IAM) free of charge or downloadable at IAM’s website);

2.Legible photocopy of the description memorandum showing the gross floor aera of the individual flat by precentage;

3.Legible photocopy of the location plan of the building;

4.Legible photocopy of the floor plan and elevation plan of the water supply system;

5.Legible photocopy of the Construction Work License issued by the Land, Public Works and Transport Bureau.

6.If the application is made by an individual, copy of applicant’s identification document, with the original required to be produced;

7.If the application is made by a company, the original or copy of Certificate of Business Registration stating all information about registration of the company or natural business owner. If the copy is submitted, its original is required to be produced;


Locations for processing the procedure and office hours

Location:

Integrated Services Centre:Avenida da Praia Grande, n.os 762-804, Edifício China Plaza, 2.º andar, Macau
Northern District Public Services Centre:Rua Nova da Areia Preta, n.º 52, Centro de Serviços da RAEM, Macau
Central District Public Services Centre:Rotunda de Carlos da Maia, n.os 5 e 7, Complexo da Rotunda de Carlos da Maia, 3.˚ andar, Macau
Islands District Public Services Centre:Rua da Ponte Negra, Bairro Social da Taipa, n.º 75K, Taipa
Centro de Serviços da RAEM das Ilhas:Rua de Coimbra, n.º 225, 3.˚ andar, Taipa

Office hours:

Integrated Services Centres and Public Services Centres
Monday to Friday, 9:00 a.m. to 6:00 p.m. (no lunch break, closed on Saturdays, Sundays and public holidays)


Fees

Application fee: Each household or each individual flat: MOP$150.00
Form fee: Not Applicable
Stamp Duty: Each household or each individual flat: MOP$15.00 (10% of application fee)
Deposit: Not Applicable
Fees, Charges and Prices List: Not Applicable


Time required for processing

Processing time: 18 working days


Remarks/ points to note for application

Important note: 1.The application must be the property owner;
2.Inspection be conducted after payment of respective fee.


Relevant standards or requirements

N/A


Progress enquiry and obtaining result of service

N/A


Content provider: Municipal Affairs Bureau (IAM)

Last modified: 2019-03-18 04:26

Environment Environmental Sanitation, greening and municipal management

Is there anything wrong with this page?

Help us improve GOV.MO

* Mandatory field

Send

All information on this site is based on the official language of the Macao Special Administrative Region. The English version is the translation from the Chinese originals and is provided for reference only. If you find that some of the contents do not have an English version, please refer to the Traditional Chinese or Portuguese versions.